Facts
& figures
General Information  
Area of main site: 2.48 sq.km
Area of Calciner: 187,000 sq.m
Area of Alba Club: 39,285 sq.m
Number of potlines: 5
Start-up of Potline 1: 1971
Start-up of Potline 2: 1971
Start-up of Potline 3: 1981
Start-up of Potline 4: 1992
Start-up of Potline 5: 2005
Start-up of Potline 6: 2018

Number of employees 3,186*
Percentage of national employees 83%
* as of 2018  

Type of finished product
Standard and T-ingots, extrusion billets, rolling slab,
properzi ingots, and molten aluminium.
Hot metal production 1,011,101 mtpa

Total Sales (2018)  
Extrusion billet 41%
Foundry Alloys 17%
Rolling Slabs 2%
Standard Ingots 13%
Liquid Metal 27%

Total Exports (2018)  
Bahrain 34%
Asia 14%
Other MENA 17%
Europe 20%
Americas 15%

Power Plant Capacity  
PS1 282 MW ISO
PS2 168 MW ISO
PS3 860 MW ISO
PS4 939 MW ISO
Total installed capacity: 2,249 MW ISO

Average metal purity  
Overall average metal purity 99.86%

Petroleum Coke Calciner and Seawater desalination Plant
Total project cost: US$ 450 million
Raw material (green petroleum coke): 775,000 mt per year
Production – calcined petroleum coke: 550,000 mt per year
Desalinated water capacity 41,000 cubic metres per day of potable water
Port facility: Able to handle 3.5 million metric tonnes of materials per year